Friday, June 22, 2007

Braeburn 3000 Digital Thermostat

the construction of the underground


The nearby subway construction is progressing very eyes.
You can see at the bottom left the wall that delimit the new bike path and the future space green.
The road will go into a tunnel and placed at the end of the work will be an oasis of peace with low-frequency traffic.
Soon the railway station north of Affori will be moved about 500 meters in order to coincide with the new metro station Affori FS
Within minutes you can reach different parts of the city: Piazza Duomo, Cadorna station Central University ...
We are happy to participate, albeit in very small change to Milan.

Tuesday, June 19, 2007

Sickest Sharking Vidoes

The site safety: the inspection



On June 14 we held a meeting about technical
with a subject of "Safety in the workplace in accordance with law no. 494/96.
work activities are carried out to achieve our Housing
should be conducted in compliance with rules dictated by laws which, like any other manual jobs, such as factories, hospitals, railway stations, farms and so on, have intended to prevent and minimize the risk of accidents and subsequent injuries. Unlike
jobs are listed first, the places where construction works are carried out are defined as "furniture" or "temporary" as the progress in carrying out the work always creates different environments for workers.
why the legislature, in addition to the Leg. No 626/94, which regulates safety in the workplace, has enacted a law specifically for the portable devices such as Decree work. 494/96 and subsequent amendments.
Given the criticality in the careful observance of standards and then the correct risk prevention, the Security Coordinator during the construction process, geom. Cristiano cremolata, considered useful to require the advice of the Territorial Joint Committee of the province of Milan.
The CPT is an independent, nonprofit, operates in the provinces of Milan - Lodi - Monza and Brianza, promoted and managed jointly by Assimpredil-ANCE (Association of Builders and complementary in the province of Milan) and the trade unions of construction workers in the province
This organization aims to promote activities, established by statute, constitution, aimed at preventing accidents, improving the health and safety on construction sites and the elimination and / or reduction of risks in the working stages, through initiatives that they experience the various areas of possible intervention : customer service and technical advice on site, conducting training courses, promotion of initiatives information, information campaigns, studies and analysis, event management, production and continuous updating, sound level measurements in the yard.

Following technical advice on construction performed on 17 - May - 07, the survey
today, with the participation of Eng. Reissner's CPT 's Eng. Cats and the architect. De Buglio (customer), the geom. Berlendis and Eng. Rota (Construction company), has the objective of verifying that the site conditions and activities comply with current regulations.
specialist technical advice of the CPT, was effective in pointing out situations that may lead to injury, although low risk
The meeting proceeded with the careful analysis of all the documentation that by law must be present at the yard: floor, safety and cCoordinamento, the operational security of firms, construction paper, books, equipment serial key, certification Installation and more.
The meeting ended with the drafting of the minutes by the technician of the CPT.

The construction activities, carried out in accordance with local regulations
as soon verified, regularly and today the business start-ups is the Movement Type the floor of the attic; We have therefore come to the realization of the penultimate floor. Activities for the manufacture of the structure of the building are almost come to an end and soon, as stipulated in the work program will begin the work of closing the housing building, where over the construction work will be performed also
works plant. But
organization and coordination of the activities we will speak later.

Thursday, June 7, 2007

Mustache Lemon Juice?



The team of carpenters, after casting the elevation of the structures (pillars) of the plan occurred in the third day of 4:06:07, gave the task of implementing the plan of the slab formwork quarter. Operators have the wooden beams to the share of the future slab soffit, supported by iron struts that support the ceiling below. On them are established in wood boards that form a flat surface on which are then laid metal armatures and clay elements. The team of carpenters proceeded with a good pace, even in light of the fact that the floor to achieve the same features as those already made on the first floor, second and third.
Go up again!