The continuation of the works, in addition to the performance of perimeter walls and partitions, with the provision of facilities and layers insulation, as described in previous measures, provides for the installation of the configured for the future installation of perimeter and interior fixtures.
At the time we are updating the site during the assembly of all window sills and thresholds to all doors windows and doors, which are available on site following the order made in due course (based on SUPPLY specific plan just in time).
Continue with the installation in support of counter and sill plates, ie fixing with cement mortar to the walls of these elements in aluminum and wood that will definitely set the window (windows, doors, doors, entry doors, etc...) The procurement the counter or falsitelai happens after the determinzione of all final measures of the openings of the entire stable.
activities pose threshold / window sills and counter are a step should not be underestimated, as the origin of the works right now that determine the final positioning of the openings around the perimeter, interior doors, the alignments of the grout (the coating of masonry brick blocks) external and internal.
This is the last stage where the designer has the right to alter the internal layout of the premises and the relevant characteristics of each of these (access, utilities, interior design) since it is closely related to the positioning of the openings.
Changes and / or omissions works involve the removal and demolition of what was already set with a remarkable increase in costs. So the 'attention should be maximum.
E ' essential in order to avoid the generation of extra costs, the project manager and contractors, operate according to a plan which identifies the largest number of construction details of the work.