Friday, September 28, 2007

Why My Daughter Should Do Cofirmation

PLUMBING - HEATING - AIR CONDITIONING






The steps of construction of our building to see this fixed in the entrance yard of the firms located.
The processing plants that have the above are those related to mechanical system, consisting of plumbing, heating and air conditioning, and the rest of the plants, such as electrical, air lifts, lift etc.. will made later.
plants that we analyze, plumbing - heating - air conditioning must be carried out according to best professional standards and with the proper care because these works should have the characteristics of durability, and the performer must guaranteed for a minimum of 10 years.
The hydraulic system is a network of pipes (metal and / or PVC), which, supplied with town water using suitable cable allows you to convey water to the users of each apartment (kitchen sink, washbasin, bidet , toilet, shower, bathtub, washing machine boiler) and to the common areas (service taps, irrigation, etc..) so as to allow each inhabitant of the home water use.
The heating is instead a circuit formed by an apparatus for heating water, heating pipelines and terminals, allowing the user to heat the temperature of a given environment or room of the house. Unlike the plumbing, the heating can be of various types (central or independent, with a gas boiler or boiler or diesel, with terminal heating to radiators or underfloor heating terminals). Our construction provides, in relation to fuel supply in the district in which we build and in relation the customs of the inhabitants, a plant with a fuel gas, water as the heating medium and heating radiators as terminals. The circuit, closed-end, it works with the passage of water, which duly heated by the boiler (through coils of metal at high temperatures after the combustion of gas) is driven by a hydraulic pump (inside the boiler) through pipes to radiators which releases its heat, to return to a lower temperature in the boiler which will again start the same cycle.
The air conditioning in our building as it is set to be fitted by the future owner of the terminals operated "cold." Conditioner "cold" is the type of device, as opposed to the heating, which lowers the temperature of a given environment or room of the house. Its operation is quite simple: it produces a temperature difference that is put into circulation causing the lowering of the temperature condition of the dwelling or the environment in which it is put into operation. The system for each apartment consists of three machines, two such units internal and third external drive that . Between the two units run two copper pipes and wiring command and control. Operation of the system is guaranteed fondamenali four parts: compressor, condenser, evaporator, body rolling, to complete the air conditioning in addition to these parts, there is a gas that acts as a heat transfer fluid.

Monday, September 3, 2007

Unmoving Kidney Stone

The work continues in August and regulatory systems




The continuation of the works, in addition to the performance of perimeter walls and partitions, with the provision of facilities and layers insulation, as described in previous measures, provides for the installation of the configured for the future installation of perimeter and interior fixtures.
At the time we are updating the site during the assembly of all window sills and thresholds to all doors windows and doors, which are available on site following the order made in due course (based on SUPPLY specific plan just in time).
Continue with the installation in support of counter and sill plates, ie fixing with cement mortar to the walls of these elements in aluminum and wood that will definitely set the window (windows, doors, doors, entry doors, etc...) The procurement the counter or falsitelai happens after the determinzione of all final measures of the openings of the entire stable.
activities pose threshold / window sills and counter are a step should not be underestimated, as the origin of the works right now that determine the final positioning of the openings around the perimeter, interior doors, the alignments of the grout (the coating of masonry brick blocks) external and internal.
This is the last stage where the designer has the right to alter the internal layout of the premises and the relevant characteristics of each of these (access, utilities, interior design) since it is closely related to the positioning of the openings.
Changes and / or omissions works involve the removal and demolition of what was already set with a remarkable increase in costs. So the 'attention should be maximum.
E ' essential in order to avoid the generation of extra costs, the project manager and contractors, operate according to a plan which identifies the largest number of construction details of the work.